All windows must be installed in prepared openings in accordance with AAMA recommendations and the below-listed manufacturers’ recommendations (If shop drawings are required, please refer to approved shop drawings for installation):

  • All vent panels must be closed and locked.
  • Each unit must be installed level, plumb and square with a 1⁄4” clearance on the jambs and the header of the window.
  • Remove wet plaster, mortar, stucco and cement immediately. (Note: windows should only be cleaned with mild soap and water.)
  • Do not set items on the sill.
  • In nail-on applications, a bead of caulking material should be applied to the inside nail-on fin just before installation to insure a watertight seal between the building and the window. In an equal leg window a bead of caulking material should also be applied.
  • Any attachment screws or bolts should be sealed during the process of installation.
  • After installation is complete, building paper and stucco wire (if a stucco application) should overlap the window nail-on flange.

How to Install a window
Best practices AAMA A1 and B1

How to flash a window with a pan system

Reynaers Aluminium - CF 77
installation movie

Reynaers Aluminium - CP 155
installation movie

Reynaers Aluminium - CW 50

Reynaers aluminium Hi Finity
Simpas premium partner

Schüco Fassadensystem FW 50+/FW 60+
Montage Fußpunktentwässerung

COVID-19 PRECAUTIONS

SIMPAS Live Better is complying with all provincial and local security and health precautions pertaining to the COVID-19 virus. We are responding to inquiries and consultations via phone, email and Zoom. SIMPAS Live Better and its suppliers are all working and prepared to provide you with information on products and services on a timely basis. Our product supplies are unrestricted. Orders, manufacturing and delivery have been continuing through these times. We experienced no delays because of COVID-19.